|
PROJECT DESCRIPTIONSSI conducted an invasive investigation for this Lake Union association to determine the condition of the building envelope. The stucco clad building had begun to show signs of water intrusion on the interiors of a few of the units. SSI worked closely with the association to develop a scope of work which included: scaffolding staging, stucco replacement, window replacements, structural framing replacements, beam replacements, integrated deck coating systems, new Pecora caulking and wall coating system on the entire building.
PROJECT DETAILSMULTI-FAMILY
TAGS:
|